Vacuum emulsifier is one of the new chemical plant production line equipment, mainly based on the production and processing in the case of vacuum pump production and manufacturing work, after very fast and often continue to carry out the actual effect of dispersion and emulsion and the production process of cutting raw materials.The key of the machine equipment consists of several parts, such as the main pot, the preparation pot, the operation of household appliances and the vacuum pump and the hydraulic machine.

1. The vacuum emulsifying mechanism is made with the same boat and two shafts. The agitator and its cutting of the equipment can operate independently, and the effect of the goods is very good.

2. Excellent electrical control system is selected for the water vacuum emulsifier to ensure its stable and stable characteristics.

3, the vacuum emulsifier is the choice of fully enclosed ultrafiltration device, to avoid the residue into the product quality problems to ensure the product.

4. There is no dead Angle inside the vacuum emulsifier, especially the raw materials with low viscosity are installed on the mixer with the wall scraper machine and equipment.

5. The main reason for the convenience of cleaning and maintenance is that the emulsion kettle of the vacuum emulsifier can be rotated.

Application process and method of vacuum emulsifier:

1. Access the switching power supply, the switching power supply meets the requirements, and pay attention to the grounding wire by the spectrum grounding device, open the main switch of the main power supply, and the indicator light is on.Appropriately connect the pipes of the homogenizing pot.

2. Before vacuum packaging, it is necessary to check whether the pot is flat with the lid, whether the pot mouth and the material mouth cover are tightly covered and the sealing is reliable.Close the valve socks on the cover, then open the vacuum valve on the vacuum emulsifier, and then open the vacuum pump vacuum package, turn off the vacuum pump and close the vacuum valve after meeting the requirements.

3, uniform drilling, scraper mixing: after feeding, and then open the corresponding automatic switch.

4. Operate the operation of the homogenizer and the operation of the scraper stirring.Stirring should also be moved before running, check whether there is abnormal stirring wall scraping, if there should be immediately removed.

5. The vacuum pump can be operated under the condition of the sealing of the vacuum emulsifier.If there is a unique must open the air to run the pump, the operation can not be more than 3 minutes.

6. The vacuum pump shall not operate without cutting fluid.Do not block the exhaust pipe when the pump is in operation.

7. Regularly maintain grease and vegetable grease in each component and rolling bearing, and immediately remove clean grease and vegetable grease.

8, maintain the vacuum emulsifier cleaning.Each time to stop or replace raw materials should be cleaned up the vacuum emulsifier and cutting fluid contact part, especially the laser cutting wheel at the top of its head, laser cutting sleeve, uniform coupling in the rolling bearing and coupling.After cleaning and assembling again, the hand-rotating centrifugal impeller should have no jacking, the relative flange of the pot body and the pot cover, the fixed fixed actuator, the point homogenizer, the motor is turned to the right direction, and there is no other abnormality, and it can run and run.The cleaning work of all vacuum emulsifier shall be solved by the customer according to the specifications.